An 800 MW generator trips in a Balancing Authority
external to your Balancing Authority Area. Which of
the following indications would you expect to see in
your area?
A) Net Actual Interchange would decrease
significantly.
B) ACE would drop to approximately -800 MW.
C) Frequency would drop, and ACE would remain
relatively unchanged.
D) Frequency would drop, and ACE would increase
significantly. - ...ANSWER...C) Frequency would drop,
and ACE would remain relatively unchanged.
When is the only time voltage reduction for load relief
is acceptable on the transmission system?
A) When voltage on the distribution system is already
low.
B) It is acceptable anytime load relief is needed.
C) When the system is separated from the
Interconnection.
D) When Interconnection frequency is above 60.00 Hz.
- ...ANSWER...C) When the system is separated from
the Interconnection.
In system restoration, priority should be given to:
A) Restoring customer load as quickly as possible.
B) Reporting disturbance to NERC and DOE.
C) Restoring auxiliary power to off-line generators.
D) Restoring power to critical facilities. -
...ANSWER...D) Restoring power to critical facilities.
If a Balancing Authority or Reserve Sharing Group is
experiencing conditions where all available resources
are committed to meet firm load, firm transactions, and
reserve commitments, what does the deficient entity
need to request their Reliability Coordinator to issue?
A) Energy Emergency Alert Level 3
B) Energy Emergency Alert Level 1
C) Energy Emergency Warning
D) Energy Emergency Alert Level 2 - ...ANSWER...B)
Energy Emergency Alert Level 1
A Transmission Operator's Emergency Operating Plan
states when voltages fall below .87 per unit (p.u.) or
87% of nominal voltage and remains at that level for a
sustained period of 10 minutes or longer, manual load
reduction actions are required. When the system voltage
returns to .9 p.u. or 90% manual load disconnection is
not required.
If a generator trips off line within the BA and the
nearby 230 kV system voltage immediately drops to
200 kV and remains at that level for the next 3 minutes.
What is the BA required to do?
A) Wait 7 minutes for the remaining generator AVRs to
respond; close capacitor banks; adjust Transformer
Taps.
B) Immediately disconnect firm system load until the
voltage returns to at least .9 p.u. Notify the RC of the
amount of load disconnected.
C) Immediately take actions to raise the voltage
EXCEPT removing firm system load. Notify the RC
and neighboring BA's. Prepare for manual load
reduction if the voltage remains below 9 p.u over the

Preview document (3 van de 101 pagina's)

Unlock document

Download alle 101 pagina's voor € 24,01

Document in winkelwagen
Document rapporteren Document rapporteren

Voordelen van Knoowy

€ 24,01

Document in winkelwagen
  • check Niet tevreden? Geld terug
  • check Document direct te downloaden
  • check € 0,50 korting bij betalen met saldo
  • check Ontvang gratis oefenvragen bij document

Specificaties

Verkoper

COLWISE

31 documenten geüpload

1 documenten verkocht


Hello and welcome to Colwise! I'm excited to have you here. At Colwise, we specialize in selling a wide range of examinations across various courses and academic levels, ensuring top-notch quality and comprehensive coverage.With expertise in disciplines ranging from nursing and psychology to mathematics and engineering, our commitment is to provide meticulously crafted examinations that meet the highest academic standards. As one of the top-rated sellers on Knoowy, we pride ourselves on delivering exams that cater to the needs of students from masters to certificate levels.Trust Colwise for your examination needs and let us help you excel academically. Thank you for choosing Colwise—we look forward to supporting your educational journey!

Verdienen aan je samenvattingen?

icon 2

Maak je zelf samenvattingen of heb je nog uitgewerkte opdrachten liggen? Upload je documenten dan op Knoowy en verdien geld.

Document uploaden

Al meer dan 146.000 tevreden studenten

  • FCW
    FCW

    Handig te gebruiken bij het leren en er is veel aanbod op de website.

  • EBELMANS
    EBELMANS

    Prima ervaring, vlotte betaling, alles vlot kunnen downloaden Zeker voor herhaling vatbaar.

  • Lisanne Buckers
    Lisanne Buckers

    Knoowy is voor mij de perfecte service om een centje bij te verdienen! Die samenvattingen moet ik sowieso maken, dus waarom ze niet uploaden en wat bijverdienen?

  • maredalmolen
    maredalmolen

    Super handig als je weinig tijd hebt. Samenvattingen zijn makkelijk te vinden en keuze is groot.

  • Petra    van Berghe
    Petra van Berghe

    Ik vind Knoowy erg handig om samenvattingen van mijn opleiding te kopen.

  • martinraasveld3105
    martinraasveld3105

    Prima database om studiemateriaal uit te halen, goed toegankelijk, eenvoudig zoeken.

  • JadeVanBignoot
    JadeVanBignoot

    Knoowy is zeker aan te raden. Goedkoop en je krijgt meteen je document!

  • pensieve
    pensieve

    Deze site is een uitkomst als samenvatten niet je sterkste punt is. Zeker als je moet leren voor toetsen kun je hier alle nodige info vinden. Win-win.

Inloggen via e-mail
Nieuw wachtwoord aanvragen
Registreren via e-mail
Winkelwagen
  • loader

Actie: ontvang 10% korting bij aankoop van 3 of meer items! Actie: ontvang 10% korting bij aankoop van 3 of meer items!

Actie: ontvang 10% korting bij aankoop van 3 of meer items!

loader

Ontvang gratis €2,50 bij je eerste upload

Help andere studenten door je eigen samenvattingen te uploaden op Knoowy. Upload ten minste één document en krijg gratis € 2,50 tegoed.

Upload je eerst document